EN
Home / Blog / Akaroa Main Wharf rebuild

The Akaroa wharf rebuild

The blue wharf at the end of Beach Road is coming down and going back up 600 mm higher. Until mid 2027, the harbour boats leave from other jetties.

A floating pontoon jetty with small boats tied up and the Akaroa waterfront behind
During the rebuild, most boats use Drummonds Jetty and its floating pontoon. Illustration.

Booking choice: The Black Cat nature cruise, from $76 per person. Check dates Tour details

Akaroa's Main Wharf dates from 1888 and has been the starting point for harbour cruises for decades. Christchurch City Council decided years ago that it was near the end of its life, and the replacement is now under way. For visitors, the short version is simple: your boat still leaves from Akaroa's waterfront, just not from the old wharf.

Here is the timeline from the council's own announcements, where each operator checks in and boards now, and what the works mean for parking and for cruise-ship passengers.

The quick answer

The Main Wharf is closed for a full rebuild that the council expects to finish in mid 2027. Black Cat checks in at 61 Beach Road. Akaroa Dolphins checks in at 65 Beach Road and boards at Drummonds Jetty. Fox II sails from Daly's Wharf. Cruise-ship tenders land at Drummonds Jetty. Allow 10 extra minutes to find your boat.

Why is Akaroa's Main Wharf being replaced?

The 1888 timber wharf was assessed as near the end of its useful life, and repairs no longer made sense. The new one sits on the same spot, 500 to 600 mm higher.

The council's Akaroa Wharf project page traces the decision back to a 2018 assessment. The new wharf is being raised 500 to 600 mm to cope with sea level rise, and it will be set back about two metres from the privately owned buildings at its landward end, according to the council. The budget is now $27 million, up from an earlier $19.1 million.

The design was developed with Ōnuku Rūnanga. The council's April 2026 design update describes a carved taurapa (a waka stern post) about 6 metres high, a whāriki-pattern timber entrance, diagonal timber bracing that echoes the 1888 wharf, and a handrail salvaged from the old structure.

When will the new Akaroa wharf be finished?

The council's target is mid 2027. Resource consent was granted on 20 May 2026, and construction was due to start in June 2026.

The joint decision of the hearing commissioners was released on 20 May 2026 and granted the consents with conditions. The council had said construction would begin in June, after that decision and final approvals, and continue through to mid 2027. Akaroa's visitor site now confirms that work has begun on the blue wharf.

Most of the heavy work happens from a barge running between the wharf and the Akaroa boat ramp. The southern end of the Recreation Ground, at the entrance to town, is fenced off as the contractor's yard. Treat mid 2027 as a target, not a promise: marine construction slips with weather.

DateMilestoneSource
2018Assessment: wharf near the end of its useful lifeCCC
18 Dec 2024Rebuilt Drummonds Jetty reopensCCC / ODT
20 Dec 2024Daly's Wharf reopens after strengtheningCCC / ODT
Early Feb 2025Floating pontoon at Drummonds in useODT
Aug 2025Resource consent lodgedCCC Newsline
1 May 2026Black Cat check-in moves to 61 Beach RoadBlack Cat
20 May 2026Consent granted with conditionsCCC / ECan
June 2026Construction due to startCCC
Mid 2027Target completionCCC

Where do Akaroa harbour cruises leave from during the rebuild?

Mostly from Drummonds Jetty, a short walk north of the old wharf. Each operator checks you in at its own office on Beach Road first.

Akaroa's visitor notice says "most harbour cruises and boat departures are now operating from Drummond's Wharf" and that operators have put up signs. In practice the check-in desk matters more than the jetty, because that is where you pick up your boarding pass.

Black Cat's nature cruise and swim check in at 61 Beach Road; staff give you directions to the jetty in use. Akaroa Dolphins collects tickets at 65 Beach Road 30 minutes before departure and boards at Drummonds Jetty 15 minutes before. The Fox II sailing trip uses Daly's Wharf, at the north end of the bay. The sunrise kayak trip meets at the Akaroa Bowling Club on Rue Jolie, away from the works.

A warning from the reviews. One Viator guest in December 2025 wrote that "the meeting point is wrong" and missed the cruise. Read the meeting point in your confirmation, then walk past the office the evening before.

OperatorCheck in atBoards atArrive
Black Cat (cruise and swim)61 Beach RoadJetty named on your boarding pass20 min before
Akaroa Dolphins65 Beach RoadDrummonds Jetty30 min before
Fox II sailingDaly's WharfDaly's WharfPer confirmation
Akaroa Guided KayaksBowling Club, 42 Rue JolieNot the wharfPer confirmation
Cruise-ship tendersn/aDrummonds JettyShip's schedule
A Black Cat catamaran leaving a white wake on Akaroa Harbour
Black Cat's catamaran. Check-in is now at the office at 61 Beach Road.

Two hours to the harbour heads, hot drinks on board, and a free re-cruise voucher if no dolphins show.

Check dates for the Black Cat nature cruise

What are Drummonds Jetty and Daly's Wharf?

Two older jetties the council rebuilt in 2024 so the harbour could keep working. Drummonds now has a floating pontoon; Daly's took over the fuel pump and the crane.

The council's August 2024 plan named both as the stand-ins for the Main Wharf. Drummonds Jetty was rebuilt to stretch 108 metres into the harbour and reopened at 9 am on 18 December 2024; Daly's Wharf, strengthened and re-decked, followed on 20 December, as the Otago Daily Times reported.

The floating pontoon at Drummonds came into use in early February 2025, after a parts delay. It gives boats enough depth at low tide, which is why the commercial operators and the cruise-ship tenders moved there. Daly's Wharf took the diesel pump and a new crane from the Main Wharf, plus water and lighting.

Both are public. You can walk out on Drummonds to watch the boats come in, though on a cruise-ship morning it is a busy place.

The ketch Fox II under red sails on Akaroa Harbour
Fox II, a 1922 kauri ketch, sails from Daly's Wharf.

Where do you park in Akaroa during the wharf works?

Use the free Gaiety Hall car park on Rue Jolie, up to 8 hours and campervans included.

Black Cat recommends the Gaiety Hall lot, about 3 minutes on foot from its office at 61 Beach Road. It is the simplest choice for any morning cruise. The southern end of the Recreation Ground, at the town entrance, is fenced off as the contractor's yard, so do not count on parking there.

Driving from Christchurch, plan on about 90 minutes over the Hilltop on SH75, then 10 minutes to park and walk. If you are cutting it fine for a 10:45 departure, skip the coffee stop until afterwards. Our day trip guide covers the drive and the shuttles.

What does the wharf rebuild mean for cruise-ship passengers?

Tenders land at Drummonds Jetty, about 180 m from the old wharf, right in the village. No shuttle is needed, and two cruise operators board from the same spot.

CruiseMapper's Akaroa port page notes that tenders use Drummonds Jetty during the rebuild, "about 180 m northeast of the Main Wharf". From there you are on Beach Road within a minute. Akaroa Dolphins boards from the same jetty, which makes it the simplest harbour cruise for a ship passenger.

Akaroa only expects a handful of ships in 2026-27. The dates, and what to book on a port day, are in our post on cruise-ship days in Akaroa.

Frequently asked questions

Is Akaroa Main Wharf closed?

Yes. The Main Wharf is closed for demolition and rebuilding, with completion targeted for mid 2027. Harbour cruises run as normal from Drummonds Jetty and Daly's Wharf.

Where does Black Cat leave from in Akaroa in 2026?

Check in at the Black Cat office, 61 Beach Road, at least 20 minutes before departure. Staff give you a boarding pass and directions to the jetty in use.

Where do cruise ship tenders land in Akaroa?

At Drummonds Jetty, about 180 m northeast of the Main Wharf, while the wharf is rebuilt. It is in the village, so you can walk straight to the cafes and cruise offices.

When will the new Akaroa wharf open?

The council's target is mid 2027. Consent was granted on 20 May 2026 and work was due to start in June 2026.

Ready to book

Choose your trip

Cancellation terms are on each tour page. Prices are from-prices in USD and move with the season.

Black Cat Akaroa Harbour Nature Cruise

Black Cat Akaroa Harbour Nature Cruise

★ 4.7 · 2 hours

  • Two-hour cruise with full commentary
  • Tea, coffee or hot chocolate
  • Free re-cruise voucher if no dolphins are seen
From$76per personCheck dates
Akaroa Dolphins Harbour Nature Cruise

Akaroa Dolphins Harbour Nature Cruise

★ 5.0 · 2 hours

  • Two-hour cruise to the harbour heads and back
  • Skipper and guide commentary
  • One drink: beer, New Zealand wine or a soft drink
From$81per personCheck dates
Fox II Sailing & Wildlife Cruise

Fox II Sailing & Wildlife Cruise

★ 4.9 · 2 h 45 min

A 1922 kauri ketch, engine off, dolphins alongside

From$84per personCheck dates

Plan your date before you go

Akaroa's original nature cruise: two hours to the harbour heads, hot drinks on board, and a free re-cruise voucher if no dolphins show.

Check dates for the Black Cat nature cruise